| Peer-Reviewed

Design of Construction Management System of Rotary Drilling Pile Based on BIM

Received: 19 May 2022    Accepted: 9 June 2022    Published: 21 June 2022
Views:       Downloads:
Abstract

Pile foundation engineering was a hidden work, it includes three processes: mechanical hole forming, reinforcement cage fabrication and installation, concrete pouring. Pile foundation construction was characterized by great difficulty in process management and high cost of remedy in case of quality problems. Besides, due to the uncertainty of the site stratum, it was difficult to accurately and timely feed back the final hole depth into the rock, and mechanical hole forming cannot create favorable conditions for subsequent processes. Rotary drilling pile has the advantages of high efficiency, good safety and strong stratum applicability, which was widely used in pile foundation construction. In order to improve the construction efficiency and information management level of pile foundation engineering, a set of rotary drilling pile construction management system was developed. The system was based on the key points of pile foundation engineering management to monitor the positioning, hole depth and drilling rate, verticality, current, noise and other parameters respectively. It uses 3D geology and BIM to display the relationship between hole depth and stratum in real time, otherwise it applies the multivariate data of monitoring to realize automatic rock-socketed judgment. The system could comprehensively monitor and manage the construction process information of rotary drilling pile, dynamically correct the potential quality problems in the process, which effectively reduces the difficulty of process management and saves construction time.

Published in Applied Engineering (Volume 6, Issue 1)
DOI 10.11648/j.ae.20220601.14
Page(s) 24-29
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Rotary Drilling, BIM, Construction Management, Internet of Things

References
[1] Cai Degou, et al. Information technology of railway subgrade engineering [J]. Railway construction, 2020, 60 (04): 28-33.
[2] Zhu Hongwei, et al. Research and application of automatic monitoring system for pile foundation construction process [J]. Railway construction, 2017, 57 (12): 71-74.
[3] Rao Wubin, Liu Mingyang. Application analysis of mixing pile Control based on digital cloud platform [J]. Engineering Construction, 2022, 54 (1): 41-45.
[4] Wang Yiming et al. Construction technology, 2018, 47 (suppl.): 220-223.
[5] Wang Huabin. BIM Based Construction Quality Management of Foundation Engineering [D]. Guangzhou University, 2018.
[6] Parka C, Leea D. Kwona O, et al. A Framework for Proactive Construction Defect Management Using Bim [J]. Automation in Construction, 2013, 6 (33): 61-71.
[7] Kwow O S, et al. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality [J]. Automation in Construction, 2014, 46 (10): 74-81.
[8] Lijuan Chen, Hanbin Luo. A BIM-based construction quality management model [J]. Automation in construction, 2014, 46 (10): 64-73.
[9] Gordon C. Akinci B. Technology and Process Assessment of Using Ladar and Embedded Sensing for Construction Quality Control [J]. Construction Research Congress, 2014, 8 (22): 1-10.
[10] Oh-Seong Kwon, Chan-Sik Park, Chung-Rok Lim. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality [J]. Automation in Construction, 2014, 46 (10): 74-81.
[11] Zhang Jingjie, Han Yu, Ma Guoxin, Han Shichun. Research on intelligent warning System of Construction workers height fall Accident based on BIM and RFID [J]. Journal of engineering management, 2015, 29 (06): 17-21.
[12] Sun Wu, Han Yu, Ma Guoxin, Li Lei, Lu Kanye. Construction workers intelligent management system integrating BIM and RFID [J]. Journal of engineering management, 2017, 31 (02): 95-99.
[13] Jiao Y, Zhang S, Li Y, et al. Towards cloud Augmented Reality for construction application by BIM and SNS integration [J]. Automation in Construction, 2013, 33 (16): 37-47.
[14] Jiang Wenchao, et al. Application of Beidou satellite navigation system in Railway Public Works [J]. Railway construction, 2015 (09): 128-130.
[15] Li Lin, et al. Study on the technology of rotary driling rig used for bored piles [J]. Strategic Study of CAE, 2010, 12 (04): 33-36.
Cite This Article
  • APA Style

    Gu Wentian, Qi Ziwei, Xiao Wenhai. (2022). Design of Construction Management System of Rotary Drilling Pile Based on BIM. Applied Engineering, 6(1), 24-29. https://doi.org/10.11648/j.ae.20220601.14

    Copy | Download

    ACS Style

    Gu Wentian; Qi Ziwei; Xiao Wenhai. Design of Construction Management System of Rotary Drilling Pile Based on BIM. Appl. Eng. 2022, 6(1), 24-29. doi: 10.11648/j.ae.20220601.14

    Copy | Download

    AMA Style

    Gu Wentian, Qi Ziwei, Xiao Wenhai. Design of Construction Management System of Rotary Drilling Pile Based on BIM. Appl Eng. 2022;6(1):24-29. doi: 10.11648/j.ae.20220601.14

    Copy | Download

  • @article{10.11648/j.ae.20220601.14,
      author = {Gu Wentian and Qi Ziwei and Xiao Wenhai},
      title = {Design of Construction Management System of Rotary Drilling Pile Based on BIM},
      journal = {Applied Engineering},
      volume = {6},
      number = {1},
      pages = {24-29},
      doi = {10.11648/j.ae.20220601.14},
      url = {https://doi.org/10.11648/j.ae.20220601.14},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ae.20220601.14},
      abstract = {Pile foundation engineering was a hidden work, it includes three processes: mechanical hole forming, reinforcement cage fabrication and installation, concrete pouring. Pile foundation construction was characterized by great difficulty in process management and high cost of remedy in case of quality problems. Besides, due to the uncertainty of the site stratum, it was difficult to accurately and timely feed back the final hole depth into the rock, and mechanical hole forming cannot create favorable conditions for subsequent processes. Rotary drilling pile has the advantages of high efficiency, good safety and strong stratum applicability, which was widely used in pile foundation construction. In order to improve the construction efficiency and information management level of pile foundation engineering, a set of rotary drilling pile construction management system was developed. The system was based on the key points of pile foundation engineering management to monitor the positioning, hole depth and drilling rate, verticality, current, noise and other parameters respectively. It uses 3D geology and BIM to display the relationship between hole depth and stratum in real time, otherwise it applies the multivariate data of monitoring to realize automatic rock-socketed judgment. The system could comprehensively monitor and manage the construction process information of rotary drilling pile, dynamically correct the potential quality problems in the process, which effectively reduces the difficulty of process management and saves construction time.},
     year = {2022}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Design of Construction Management System of Rotary Drilling Pile Based on BIM
    AU  - Gu Wentian
    AU  - Qi Ziwei
    AU  - Xiao Wenhai
    Y1  - 2022/06/21
    PY  - 2022
    N1  - https://doi.org/10.11648/j.ae.20220601.14
    DO  - 10.11648/j.ae.20220601.14
    T2  - Applied Engineering
    JF  - Applied Engineering
    JO  - Applied Engineering
    SP  - 24
    EP  - 29
    PB  - Science Publishing Group
    SN  - 2994-7456
    UR  - https://doi.org/10.11648/j.ae.20220601.14
    AB  - Pile foundation engineering was a hidden work, it includes three processes: mechanical hole forming, reinforcement cage fabrication and installation, concrete pouring. Pile foundation construction was characterized by great difficulty in process management and high cost of remedy in case of quality problems. Besides, due to the uncertainty of the site stratum, it was difficult to accurately and timely feed back the final hole depth into the rock, and mechanical hole forming cannot create favorable conditions for subsequent processes. Rotary drilling pile has the advantages of high efficiency, good safety and strong stratum applicability, which was widely used in pile foundation construction. In order to improve the construction efficiency and information management level of pile foundation engineering, a set of rotary drilling pile construction management system was developed. The system was based on the key points of pile foundation engineering management to monitor the positioning, hole depth and drilling rate, verticality, current, noise and other parameters respectively. It uses 3D geology and BIM to display the relationship between hole depth and stratum in real time, otherwise it applies the multivariate data of monitoring to realize automatic rock-socketed judgment. The system could comprehensively monitor and manage the construction process information of rotary drilling pile, dynamically correct the potential quality problems in the process, which effectively reduces the difficulty of process management and saves construction time.
    VL  - 6
    IS  - 1
    ER  - 

    Copy | Download

Author Information
  • China Railway Academy (Shenzhen) Research and Design Institute Co., LTD, Shenzhen, China

  • China Railway Academy (Shenzhen) Research and Design Institute Co., LTD, Shenzhen, China

  • China Railway Academy (Shenzhen) Research and Design Institute Co., LTD, Shenzhen, China

  • Sections