| Peer-Reviewed

Assessment of High-Rise Buildings During the Operation Stage in Addis Ababa City

Received: 16 August 2022    Accepted: 13 September 2022    Published: 31 October 2022
Views:       Downloads:
Abstract

To afford extra built-up space vertically both for working and living, high-rise buildings are constructed. Living in high-rise buildings has advantages as well as disadvantages. On the constructive side high-rise buildings can accommodate more people closer to work places, thus decreasing the length of work journeys and energy consumption. When we see the disadvantage side high-rise buildings needs extra equipments and facilities for vertical transportation, safety, and parking space. The construction of high-rise buildings in Addis Ababa is increasing rapidly nowadays. But during accommodation many problems affect the operation of the building while the construction is completed. The aim of this study is to identify the major challenges of high-rise buildings; to measure the satisfaction level of occupants of high-rise buildings; and to check the presence and functions of safety measures which are fixed in high-rise buildings. This research involves both qualitative and quantitative approaches for data collection and analysis. To gather quantitative data, survey questionnaires were administered to owners and occupants of high-rise buildings. For qualitative approach, in-depth interviews were carried out to purposefully selected respondents. In addition, observation was used. Lastly, data were collected from documents such as policy documents and reports of the Addis Ababa construction bureau. The data collected was analyzed using descriptive statistics. This study identified major challenges of high-rise buildings during the operation stage. The research result indicates that the key problems during the operation stage identified as lack of sufficient parking space, vertical transportation problems, and cleaning and maintenance problems. The outcome of the study helps the occupants of high-rise buildings and as a whole the construction industry to understand the actual factors during the operation of high-rise buildings.

Published in American Journal of Construction and Building Materials (Volume 6, Issue 2)
DOI 10.11648/j.ajcbm.20220602.11
Page(s) 80-84
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Cleaning, Maintenance, High Rise, Parking Space, Vertical Transportation

References
[1] A. Farouk, "High Rise Buildings and How They Affect Countries Progression," International journal of high rise buildings, pp. 1-14, 2011.
[2] Eichner, M and Ivanova, Z, "Socioecological Aspects of High-rise Construction," in E3S Web of Conferences, Moscow, 2018.
[3] A. A. Mike, "The problems/possible solutions of managing a high rise multi-tenanted office complex in Abuja metropolis - A case study of the Industrial Training Fund (ITF) house, No 6 Adetokunbo Ademola Crescent, Wuse II, Abuja," International journal of Environmental sciences, vol. 5, no. 5, pp. 1043-1051, 2015.
[4] A. N. Ede, "Challenges Affecting the Development and Optimal Use of Tall Buildings in Nigeria," The International Journal Of Engineering And Science, vol. 3, no. 4, pp. 12-20, 2014.
[5] Nimlyat, P. S, Audu, A. U., Ola-Adisa, E. O., Gwatau, D., "An evaluation of fire safety measures in high-rise buildings in Nigeria," Sustainable Cities and Society, pp. 776-785, 2017.
[6] Bhatija, K. K., Chinmayi, H. K., and Shweta, B., "Sustainable high rise buildings- design and material perspective," National Conference on Emerging Trends in Construction Technology and Sustainability, pp. 1-6, 2018.
[7] Garg, R. and Sharma, K. A., "Advantages, disadvantages and challenges of sustainable vertical cities," International Research Journal of Engineering and Technology, vol. 05, no. 01, pp. 339-342, 2018.
[8] Hernelind, J. and Roivainen, G., "High rise elevators – challenges and solutions in ride comfort simulations," in Science in the Age of Experience, 2017.
[9] Aliyu, A. A., Funtua, H. A., Mammadi, A., Bukar, B. G., Garkuwa, A. I., and Abubakar, M. M., "Management Problems Associated with Multi-Tenanted HighRise Commercial Buildings in Kaduna Metropolis, Nigeria," Civil and Environmental Research, vol. 8, no. 1, pp. 114-123, 2016.
[10] Duvanov et al..., "Optimize the use of a parking space in a residential area," in 15th International scientific conference “Underground Urbanisation as a Prerequisite for Sustainable Development”, St. Petersburg, 2016.
[11] Cowlard, "Fire Safety design for tall buildings," 2013.
[12] E. Mensah, "Challenges of maintenance management of commercial buildings in Ghana: a case study of social security and national insurance trust properties in Accra," Thesis, pp. 1-68, 2015.
[13] M. Kironji, "Evaluation of Fire Protection Systems in Commercial Highrise Buildings for Fire Safety Optimization A Case of Nairobi Central Business District," International Journal of Scientific and Research Publications, vol. 5, no. 10, pp. 1-8, 2015.
[14] Ahmed, A., Mansor, A., and Albagul, A., "Design and Fabrication of an Automatic," in Lecture Notes in Mechanical Engineering, Switzerland, 2015.
[15] Wikipedia Contributors, "Fire alarm system," 18 November 2019. [Online]. Available: https://en.wikipedia.org/w/index.php?title=Fire_alarm_system&oldid=926731316.
[16] Wikipedia contributors, "Elevator," 21 November 2019. [Online]. Available: https://en.wikipedia.org/w/index.php?title=Elevator&oldid=926009923.
Cite This Article
  • APA Style

    Amanual Temesgen Mosie. (2022). Assessment of High-Rise Buildings During the Operation Stage in Addis Ababa City. American Journal of Construction and Building Materials, 6(2), 80-84. https://doi.org/10.11648/j.ajcbm.20220602.11

    Copy | Download

    ACS Style

    Amanual Temesgen Mosie. Assessment of High-Rise Buildings During the Operation Stage in Addis Ababa City. Am. J. Constr. Build. Mater. 2022, 6(2), 80-84. doi: 10.11648/j.ajcbm.20220602.11

    Copy | Download

    AMA Style

    Amanual Temesgen Mosie. Assessment of High-Rise Buildings During the Operation Stage in Addis Ababa City. Am J Constr Build Mater. 2022;6(2):80-84. doi: 10.11648/j.ajcbm.20220602.11

    Copy | Download

  • @article{10.11648/j.ajcbm.20220602.11,
      author = {Amanual Temesgen Mosie},
      title = {Assessment of High-Rise Buildings During the Operation Stage in Addis Ababa City},
      journal = {American Journal of Construction and Building Materials},
      volume = {6},
      number = {2},
      pages = {80-84},
      doi = {10.11648/j.ajcbm.20220602.11},
      url = {https://doi.org/10.11648/j.ajcbm.20220602.11},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajcbm.20220602.11},
      abstract = {To afford extra built-up space vertically both for working and living, high-rise buildings are constructed. Living in high-rise buildings has advantages as well as disadvantages. On the constructive side high-rise buildings can accommodate more people closer to work places, thus decreasing the length of work journeys and energy consumption. When we see the disadvantage side high-rise buildings needs extra equipments and facilities for vertical transportation, safety, and parking space. The construction of high-rise buildings in Addis Ababa is increasing rapidly nowadays. But during accommodation many problems affect the operation of the building while the construction is completed. The aim of this study is to identify the major challenges of high-rise buildings; to measure the satisfaction level of occupants of high-rise buildings; and to check the presence and functions of safety measures which are fixed in high-rise buildings. This research involves both qualitative and quantitative approaches for data collection and analysis. To gather quantitative data, survey questionnaires were administered to owners and occupants of high-rise buildings. For qualitative approach, in-depth interviews were carried out to purposefully selected respondents. In addition, observation was used. Lastly, data were collected from documents such as policy documents and reports of the Addis Ababa construction bureau. The data collected was analyzed using descriptive statistics. This study identified major challenges of high-rise buildings during the operation stage. The research result indicates that the key problems during the operation stage identified as lack of sufficient parking space, vertical transportation problems, and cleaning and maintenance problems. The outcome of the study helps the occupants of high-rise buildings and as a whole the construction industry to understand the actual factors during the operation of high-rise buildings.},
     year = {2022}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Assessment of High-Rise Buildings During the Operation Stage in Addis Ababa City
    AU  - Amanual Temesgen Mosie
    Y1  - 2022/10/31
    PY  - 2022
    N1  - https://doi.org/10.11648/j.ajcbm.20220602.11
    DO  - 10.11648/j.ajcbm.20220602.11
    T2  - American Journal of Construction and Building Materials
    JF  - American Journal of Construction and Building Materials
    JO  - American Journal of Construction and Building Materials
    SP  - 80
    EP  - 84
    PB  - Science Publishing Group
    SN  - 2640-0057
    UR  - https://doi.org/10.11648/j.ajcbm.20220602.11
    AB  - To afford extra built-up space vertically both for working and living, high-rise buildings are constructed. Living in high-rise buildings has advantages as well as disadvantages. On the constructive side high-rise buildings can accommodate more people closer to work places, thus decreasing the length of work journeys and energy consumption. When we see the disadvantage side high-rise buildings needs extra equipments and facilities for vertical transportation, safety, and parking space. The construction of high-rise buildings in Addis Ababa is increasing rapidly nowadays. But during accommodation many problems affect the operation of the building while the construction is completed. The aim of this study is to identify the major challenges of high-rise buildings; to measure the satisfaction level of occupants of high-rise buildings; and to check the presence and functions of safety measures which are fixed in high-rise buildings. This research involves both qualitative and quantitative approaches for data collection and analysis. To gather quantitative data, survey questionnaires were administered to owners and occupants of high-rise buildings. For qualitative approach, in-depth interviews were carried out to purposefully selected respondents. In addition, observation was used. Lastly, data were collected from documents such as policy documents and reports of the Addis Ababa construction bureau. The data collected was analyzed using descriptive statistics. This study identified major challenges of high-rise buildings during the operation stage. The research result indicates that the key problems during the operation stage identified as lack of sufficient parking space, vertical transportation problems, and cleaning and maintenance problems. The outcome of the study helps the occupants of high-rise buildings and as a whole the construction industry to understand the actual factors during the operation of high-rise buildings.
    VL  - 6
    IS  - 2
    ER  - 

    Copy | Download

Author Information
  • Department of Construction Technology and Management, University of Gondar, Gondar, Ethiopia

  • Sections