The method of map production by using UAV photogrammetry is widely-used in Turkey and World in recent years. With the developing technology, the capabilities of UAV platforms increase in parallel with the scale of projects, which are done by using UAVs, almost reaches to enough magnitude in order to compete with manned aircraft platforms. In the article, it has been discussed in observing, analyzing and reporting of cut and fill productions within the scope of 270km railway Project in Ethiopia. In the result of article, it has been evaluated that the maps required by large-scale construction projects can be produced by using UAVs within high accuracies and it has some advantages in time and cost.
Published in | American Journal of Remote Sensing (Volume 5, Issue 2) |
DOI | 10.11648/j.ajrs.20170502.12 |
Page(s) | 16-23 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2017. Published by Science Publishing Group |
UAV, Photogrammetry, Railway, Construction, Mapping, DTM, DSM, Observing, Analyzing
[1] | Colomina, I and Molina, P, 2014. Unmanned aerial systems for photogrammetry and remote sensing: a review, ISPRS Journal of Photogrammetry and Remote Sensing, 92:82–95 |
[2] | Przybilla, H.-J. and Wester-Ebbinghaus, W., 1979. Bildflug mit ferngelenktem Kleinflugzeug. Bildmessung und Luftbildwesen, Zeitschrift fuer Photogrammetrie und Fernerkundung, 47(5), pp. 135-140. |
[3] | Hongoh, D., Kajiwara, K. and Honda, Y., 2001. Developing ground truth measurement system using rc helicopter and brdf model in forest area. In: 22nd Asian Conference on Remote Sensing, Vol. 5, Sigapore, p. 9. |
[4] | Demirel A. S., Akdeniz H., Aksu O., 2007, Two Functional Software for Internal use; Flight Planning and Presenting of Digital Orthophotos, a a Harita Genel Komutanlıgı, 06100 Cebeci Ankara, Turkey - (sdemirel, hakdeniz, oaksu)@hgk.mil.tr Commission IV, WG IV/5. |
[5] | Vergouw B., Nagel H., Bondt G., and Custers B., 2006, Drone Technology: Types, Payloads, Applications, Frequency Spectrum Issues and Future Developments www.springer.com/cda/.../9789462651319-c2.pdf. |
[6] | Berni J. A., Suárez L, Dugo G., Fereres E.,, Remote Sensing of Vegetation From UAV Platforms Using Lightweight Multispectral and Thermal Imaging Sensors, Inter-Commission WG I/V. |
[7] | Qin, R., Grün, A., Huang, X., 2013. UAV Project – Building a Reality-Based 3D Model. Coordinates 9, 19–25. |
[8] | Tang, L., Braun, J., Debitsch, R. 1997,. Automatic Aerotriangulation - Concept, Realization and Results. ISPRS Journal of Photogrammetry & Remote Sensing 52, 120- 130. |
[9] | Krzystek, P., 1991. Fully Automatic Measurement of Digital Elevation Models with MATCH-T. In: 43rd Photogrammetric Week. Institut für Photogrammetrie, Universität Stuttgart, Stuttgart, Germany, pp. 205–211. |
[10] | "Digital Elevation Models (DEM): Terrain (DTM) or Surface (DSM) Data?", https://www.pagerpower.com/news/differences-digital-elevation-model-dtm-dsm/ |
[11] | Podobnikar T. 2005, Production of Integrated Digital Terrain Model From Multiple Datasets of Different Quality, IJGIS, 19/1, 71–86. |
[12] | Saadatseresht, M., A. H. Hashempourb, M. Hasanloua, 2015, UAV Photogrammetry: A Practical Solution For Mapping Projects, The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XL-1/W5, 2015 International Conference on Sensors & Models in Remote Sensing & Photogrammetry, 23–25 Nov 2015, Kish Island, Iran. |
[13] | Eisenbeiss, H., 2009, Doctoral Thesis "UAV photogrammetry" Permanent Link: https://doi.org/10.3929/ethz-a-005939264. |
APA Style
Sinan Altinisik, Semih Seckin Kavlak. (2017). By Means of Unmanned Aerial Vehicle (UAV) -Based Photogrammetry, Observing, Analyzing and Reporting of the Big Construction Projects, Ethiopia Application. American Journal of Remote Sensing, 5(2), 16-23. https://doi.org/10.11648/j.ajrs.20170502.12
ACS Style
Sinan Altinisik; Semih Seckin Kavlak. By Means of Unmanned Aerial Vehicle (UAV) -Based Photogrammetry, Observing, Analyzing and Reporting of the Big Construction Projects, Ethiopia Application. Am. J. Remote Sens. 2017, 5(2), 16-23. doi: 10.11648/j.ajrs.20170502.12
AMA Style
Sinan Altinisik, Semih Seckin Kavlak. By Means of Unmanned Aerial Vehicle (UAV) -Based Photogrammetry, Observing, Analyzing and Reporting of the Big Construction Projects, Ethiopia Application. Am J Remote Sens. 2017;5(2):16-23. doi: 10.11648/j.ajrs.20170502.12
@article{10.11648/j.ajrs.20170502.12, author = {Sinan Altinisik and Semih Seckin Kavlak}, title = {By Means of Unmanned Aerial Vehicle (UAV) -Based Photogrammetry, Observing, Analyzing and Reporting of the Big Construction Projects, Ethiopia Application}, journal = {American Journal of Remote Sensing}, volume = {5}, number = {2}, pages = {16-23}, doi = {10.11648/j.ajrs.20170502.12}, url = {https://doi.org/10.11648/j.ajrs.20170502.12}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajrs.20170502.12}, abstract = {The method of map production by using UAV photogrammetry is widely-used in Turkey and World in recent years. With the developing technology, the capabilities of UAV platforms increase in parallel with the scale of projects, which are done by using UAVs, almost reaches to enough magnitude in order to compete with manned aircraft platforms. In the article, it has been discussed in observing, analyzing and reporting of cut and fill productions within the scope of 270km railway Project in Ethiopia. In the result of article, it has been evaluated that the maps required by large-scale construction projects can be produced by using UAVs within high accuracies and it has some advantages in time and cost.}, year = {2017} }
TY - JOUR T1 - By Means of Unmanned Aerial Vehicle (UAV) -Based Photogrammetry, Observing, Analyzing and Reporting of the Big Construction Projects, Ethiopia Application AU - Sinan Altinisik AU - Semih Seckin Kavlak Y1 - 2017/11/06 PY - 2017 N1 - https://doi.org/10.11648/j.ajrs.20170502.12 DO - 10.11648/j.ajrs.20170502.12 T2 - American Journal of Remote Sensing JF - American Journal of Remote Sensing JO - American Journal of Remote Sensing SP - 16 EP - 23 PB - Science Publishing Group SN - 2328-580X UR - https://doi.org/10.11648/j.ajrs.20170502.12 AB - The method of map production by using UAV photogrammetry is widely-used in Turkey and World in recent years. With the developing technology, the capabilities of UAV platforms increase in parallel with the scale of projects, which are done by using UAVs, almost reaches to enough magnitude in order to compete with manned aircraft platforms. In the article, it has been discussed in observing, analyzing and reporting of cut and fill productions within the scope of 270km railway Project in Ethiopia. In the result of article, it has been evaluated that the maps required by large-scale construction projects can be produced by using UAVs within high accuracies and it has some advantages in time and cost. VL - 5 IS - 2 ER -