American Journal of Engineering and Technology Management

Volume 7, Issue 1, February 2022

  • Valuation: A New Approach to Measure the Performance of Last Planner System

    Osama Abusalem

    Issue: Volume 7, Issue 1, February 2022
    Pages: 1-7
    Received: 6 December 2021
    Accepted: 23 December 2021
    Published: 12 January 2022
    Downloads:
    Views:
    Abstract: The Last Planner System (LPS) is a production planning and control system that utilizes the lean construction philosophy to improve workflow reliability. Although there are several metrics developed to measure the performance of LPS, the current metrics fail to genuinely reflect the actual performance of LPS. The literature review shows no evidence... Show More
  • Obstacles to the Implementation of Joint-funded Road Projects in Cameroon

    Thomas D’Aquin Biyindi, Reine Amaleke Kinogo, Fabrice Kwefeu Mbakop, Atemengue Onambelé

    Issue: Volume 7, Issue 1, February 2022
    Pages: 8-20
    Received: 25 October 2021
    Accepted: 22 November 2021
    Published: 23 March 2022
    Downloads:
    Views:
    Abstract: The main objective of this research is to analyse and evaluate the determinants of the failure of the effective and efficient implementation of jointly financed road infrastructure projects in Cameroon. Specifically, we first analyse and assess the institutional and administrative determinants of the failure to implement jointly financed road infra... Show More